Half Star Project, banner on the Lyrium page
Half Star Project, profile picture on Lyrium

Half Star Project

"POP ROCK DANCE" ACOUSTIC QUARTET"

International acoustic covers

An acoustic quartet from Umbria specialising in weddings, parties and events, with a repertoire of pop, rock and dance music from the 1970s to the present day.

Artist reviews Average rating of 5 out of 2 reviews. Leave a review
Contact information
Headquarters: Città di Castello (PG) 🇮🇹

Operational Zones

Italy Perugia

Price

from €500 to €2,000

The price is indicative and is subject to negotiation with the artist. It may vary depending on the duration of the performance and the options requested by the organiser.

Info - Media - Portfolio

Sections of the Artist/Professional profile

Cast members

ARTISTS / FRONT-LINE STAFF

Events

Musical genres and repertoire

Experience and Features

Half Star Project was founded in 2015 as an acoustic project for public and private events, and has since specialised in luxury and destination weddings.

Over the course of more than ten years, we have performed on hundreds of stages, striving to maintain the highest possible standards of professionalism and to evolve over time so that we always keep up to date with the latest music releases, whilst never forgetting the cornerstones of international music.

The core line-up features a female vocalist, acoustic guitar, keyboards, backing vocals, cajón and percussion.

As well as music, we can provide a range of sound systems (including for hire), lighting equipment and additional services such as DJ sets and other bespoke services.

Equipment and logistics

Equipment and assembly times

We work with top-of-the-range equipment: LD Systems column array sound systems, digital mixers, programmable LED lighting, and musical instruments of the very highest calibre. Power consumption is very low (all we need is a standard 3 kW domestic power socket). Set-up times vary depending on requirements and the number of stations to be installed, but generally range from around one hour to three hours.

Accessibility and parking

Check access to the venue, parking near the unloading point, stairs, lifts, restricted traffic zones (ZTL), a stable power supply, covered space or a contingency plan in the event of an outdoor event, sound restrictions, loading/unloading times and any distances between the various sound positions.

Other logistical requirements

Nothing else to add!